GAINS Integration and EMI Test
Tillamook, OR, 12-16 June 2000
Selected photos from the test
(Photos courtesy of Aerospace Innovations.)
- The GSSL Small Balloon Facility in Tillamook, Oregon.
- The
GAINS PIII balloon inside the hangar in Tillamook, OR. A sheet of
polyethylene protects the balloon from dirt and debris during flight preparation.
- Integrating the
payload into the GAINS torus. Clockwise from
left: the battery pack, the EOSS package, and the the NASA/LaRC GPS
glistening instrument. Tom Johnson, Aerospace Innovations, and Bob
Anderson, GAINS chief engineer, are shown.
-
GPS glistening package viewed through the torus access port
-
Weighing off the payload. From left Bob Moody and Koh Murai (GSSL),
Brian Russ (Aerospace Innovations), and Jim Hurliman (GSSL).
- Outdoor radio test
June 14, 2000
- Outdoor radio test
June 15, 2000